The airport has 2 parallel runways and 2 parallel taxiways to accommodate simultaneous departures and arrivals. It has a total of 120 parking bays and 5 of these are capable of accommodating the Airbus A380 aircraft. With a capacity of handling 76 flight operations per hour, both international and domestic flights will share the airport terminal but will be assigned to different parts of the concourse.



The airport was designed by Murphy/Jahn Architects, an architectural firm from Chicaco. This multi-billion-dollar project is getting the final touches ahead of its commercial opening on September 28.
I wonder how many millions Taksin corruptly got from this project!!